Industrial Construction in Moore

Distribution, pharmaceutical and light industrial buildings in Moore, designed and scheduled with tornado season, wind loads and I-35 access in mind.

Request a Project ReviewRequest a Project ReviewRequest a Project Review

A regional pharmaceutical distributor choosing a site needs a building that holds temperature, protects inventory and can be turned over without gaps, and Moore has shown up on that kind of list. On June 24, 2026 the Oklahoma Department of Commerce announced that McKesson selected the North Moore Industrial Park for a 330,000-square-foot regional pharmaceutical distribution facility, with $179 million in total capital investment and more than 200 direct jobs. We are not a party to that project, but it points to the building type we understand: large controlled-environment distribution space with deep truck courts and serious electrical service.

Moore is also a city where weather is part of every conversation about construction, and an honest contractor says so. We design and schedule every building here with wind, shelter and debris in mind, and we are plain with owners about what that means for structure, cost and the calendar.

From the I-35 corridor, Moore sits between Oklahoma City and Norman, so it is natural for crews and equipment to serve all three. That logistics advantage also helps an owner whose work covers the whole south metro.

Designing a pharmaceutical-grade distribution shell

A pharmaceutical distribution building is judged on its envelope and its controls. The slab must be flat and sealed, the dock seals tight, the insulation continuous and the power redundant. We detail these elements from the footing up, with attention to how the roof deck, the wall panels and the dock doors meet, because leaks and thermal bridges are the common reasons a first inspection fails.

Temperature-controlled work adds mechanical load and generator capacity, which in turn affects the electrical yard and the pad for the equipment. We lay out those pads, duct banks and fuel storage locations on the civil drawings before we release the foundation work, which prevents a later cut-in through new slab. Our experience with pharmaceutical and life sciences buyers shapes how we scope these items, and the distribution center shell underneath follows the same fundamentals.

Commissioning is the last piece. Before a building holds product, someone has to prove that cooling, alarms, backup power and door sequences work together. We schedule that testing into the construction calendar rather than leaving it to the final week, and we provide the owner's quality team with the records they need for turnover under commissioning, turnover and closeout.

Building with the wind in mind

The National Weather Service rated the May 20, 2013 Newcastle-Moore tornado EF-5, with a path of about 14 miles, a maximum width of 1.1 miles and 24 lives lost. The May 3, 1999 Bridge Creek-Moore tornado was rated F5, with a 38-mile path and 36 direct fatalities recorded by the state health department. Those events are part of the city's memory, and the people we work with in Moore take building seriously because of them.

In March 2014 the Moore City Council approved tornado-inspired residential building codes requiring new homes to withstand winds up to 135 miles per hour. Those rules apply to homes, not to industrial buildings, but they signal how the community thinks about wind. On commercial and industrial projects we raise the topic early: continuous load paths, roof-to-wall connections, door ratings and a shelter area for the people who work in the building. Owners decide how far to go, and we price the options openly.

How we run a site in tornado season

On site, our approach is cautious and practical. We watch the forecast daily from March through June, plan the heaviest lifts for the calmest windows and stage materials so nothing becomes a missile. Crews know the shelter plan, supervisors carry the radio and the phone, and we keep a written stand-down protocol that does not depend on anyone's judgment in the moment.

Storm preparation extends to the product. Insulated panels, loose roof insulation and unsecured tilt-up braces are all things we secure at the end of every day. After any severe weather event, we inspect the work before releasing crews to resume, and we document damage for the owner and insurer.

Where large floor plates fit

The North Moore Industrial Park is the kind of location that supports large-footprint users, and nearby parcels along I-35 draw smaller operators who want a quick route to the interstate. For each, we recommend warehouse and logistics fulfillment shells with generous dock counts, trailer parking and enough clear height to rack high.

Access matters as much as size. A new Southwest 34th Street bridge over I-35 in Moore, begun in August 2018, opened on November 21, 2019, and corridor improvements like that change how trucks reach adjacent land. We study the local road network, including turn radii and signal timing, and may recommend entrance moves or off-site improvements if the data supports them.

South metro coverage

Our Moore work is typically coordinated with projects in Norman to the south and Oklahoma City to the north. Crews that finish a foundation in one can start the next in another, and we share equipment, surveyors and testing partners across them.

For owners who need a multi-site plan, our programmatic multi-site rollouts service lets us repeat a prototype across several locations with the same team and the same procurement strategy.

We also help owners think through the unglamorous parts of a Moore site: how stormwater leaves the parcel, which utility provider serves it, how long a power upgrade will take and whether a neighboring property owner will need to grant an easement. Those answers rarely appear on a listing, and they decide whether a schedule holds. We gather them in the first weeks and put them in a one-page risk list that the owner can read at a glance.

Plan the building for the storm and the schedule

Give us the parcel, the use and the wind and sheltering requirements you want to design to. We will return a structural approach, a sequence and a cost range that treats weather as a design input from the first meeting.

Common Questions

How do you account for tornadoes in an industrial building?

We discuss wind loads, roof and wall connections, door ratings and an interior shelter area during design, and we price those items as options. The decision belongs to the owner and the design team, and we present the cost and benefit of each level plainly.

Does the Moore residential wind code apply to my warehouse?

The 2014 Moore rules applied to new homes and required resistance to winds up to 135 miles per hour. Industrial buildings follow the commercial code the city has adopted, so we verify the current requirements with the city and then decide with you whether to exceed them.

What do you need to build pharmaceutical distribution space?

The temperature range, the volume of product, the generator and backup requirements and the validation process your quality team uses. With those, we can plan the envelope, the mechanical rooms and the electrical service, and coordinate commissioning.

Can you work with a build-to-suit schedule?

Yes. We tie our preconstruction schedule to the owner's occupancy date, release long-lead equipment early and sequence the shell so interior trades can start while exterior work finishes.

Related

Ready to talk about your project?

Request a Project Review